Ottertail Country

Ottertail Country
Ottertail South

June 13, 2017

Moving on.......

First, a little follow-up on the previous post.  I was able to get primer and one coat of paint on the new fascia boards on the M-shed.  Sneaking it in between rains.... we got 3 inches again on Sunday afternoon & evening....

 
Now to get the final coat of paint on there and the scaffold out of the way! Then I can attack those doors.  Still painting to do on the North end, and all the rafter tails will need a coat or two.
 
 

 
This pic is kinda fuzzy, but here is the start of refurbishing the giant M that was on the sliding doors.  Now have one coat of black paint on these items, should look good on the new red painted doors.
 
 
 
 
 
 
Some other local news.... a local landmark, John's Auto Care, has been destroyed by fire.  This shop was started way back by Dave Mattson.  We'll have to find a new fixit guy for our cars.....
 


 
 
 
 
 

 
Next exciting adventure!! South lower garage roof re-do....
 
 

 
Another session of tearing off three layers of rolled roofing, and the accompanying thousands of nail... not my favorite task.
 
 

 
Put down some 15# felt when enough stuff was off to accommodate a row of OSB.
 
 

 
2/3's done with tear-off!
 
 

 
All the siding had to come off the wall above the roof so I could get flashing installed.
 
 
 

 
Hey, thanks for the help, brother Tim!!!
 
 
 

 
Closing in on it....
 
 

 
Power nailers, yes!!
 
 
 

 
Forming flashing to match the wall/roof angle.
 
 
 

 
Clean-up.  Always a formidable task.
 
 
 

 
Project complete.  I'm guessing you noticed the condition of the door and window in the lower wall? Yes, just another opportunity.....     Next on the list.
 
 
 

 
Well, that's all from Ottertail Country!!  See you next time......
 
 
 

May 29, 2017

Let's look at something more recent.......

Here is a  project that I should have done a few years ago. Oh, well, better late than never, right?? Here in Ottertail Country we refer to the workshop across the yard as the "M shed". The reason is obvious if you have been here and seen the building.  Anyway, the roof is now completely re-furbished!

 
I keep getting new views of the place....
 
 

 
 

 
Here's how it started. Note the rolled roofing looking pretty tired.....
 
 

 
Replaced the lowest board along the eave, and replaced the outer rafter that will support the curved fascia board. Then got a row of OSB nailed on and roof scaffold brackets in place.
 
 

 
View from the ridge.....
 
 

 
This chimney arrangement has to go.... quite a large outer pipe assembly was fastened to and over the ridge.  Inner pipe was about six sections long with rain caps on pipe and outer assembly.
 
 

 
How to reach the ridge without additional scaffold.
 
 

 
Got some help from brother Tim.
 
 

 
All OSB on west side!!
 
 

 
Next we figured out the curved fascia boards and got them installed. The originals were quite rotted out, but we used them for a pattern for the curves.
 
 

 
West side ready for roofers.
 
 
 
 
The flip side.
 
 
 
More edge board work.
 

 
East side had more bad boards than the west.
 
 

 
Almost ready for roofing tear off and OSB.
 
 
 
 

 
The end of the tunnel was finally in sight!
 
 

 
OK, east side ready to go.
 
 

 
We put all the drip edge on, requiring four separate pieces up the gable to accommodate the curved roof.
 
 

 
 
 

 
Finally the roof rats showed up.  When we did the previous work, we put 10 roof scaffold brackets across the roof to hold the 30 feet of 2x6 scaffold plank. Then carefully worked off step ladders laying against the roof.  I couldn't help but notice the our roofing professionals used only six brackets and then stood on top of a pack of shingles to reach the top.... hmmmm.....
 
 
 

 
Tim and I supervised the shingle installation....
 
 

 
Here Scuba shows how to reach the ridge while looking very nonchalant about it.
 
 


 
So here is the completed roof project.  Now to scare some paint onto those new fascia boards. Then will come the power washer treatment on upper and lower doors, with new red paint to follow. 
 
 
 
 
 
 
I finished the last of the clean-up on Saturday.  I took Sunday off (kinda-I sawed all the boards for the new window boxes on the front of the house).  We went to Peg's mother's 95th Birthday Gathering Sunday afternoon. Had a good time........
 
 
The birthday girl.
 

 
 
Peggy with her mom, Donna, and her brothers Gary & Jim.
 
 
 
 
Donna with a few of her great-grandchildren....
 
 
 
 
Of course, good things don't last forever.... this morning I got the scaffolding set for working on another roof.  South side of the garage, lower section.  Materials should get here tomorrow, hoping for no rain for three days......
 

 

Have a great week, everyone!!!

May 23, 2017

Greetings.... just checking in to see if email subscriptions are working.  If you got an email notice for these new posts, please let me know.  I hope to be writing on a somewhat regular basis.....  Thanks much, Gene